FAQ · NDT in practice
Guidance for your inspection task.From method selection to production use.
What does an inspection need to establish? When is automation worthwhile? What evidence is needed in operation? Quality, production and engineering teams can explore 40 practical questions, with links to more detailed articles.
Find your topic
Eight topic areas covering planning, implementation and operation.
Matching questions: 40
Inspection planning
What do NDT and ZfP mean?
NDT means non-destructive testing; ZfP is the German term. These methods examine materials and components without destroying them for their intended use. What an inspection can establish depends on the selected method and the specific task.
Read the article: An inspection concept starts with the right questionWhen should NDT be involved in a project?
Ideally before component design, production sequence and equipment requirements are finalised. This allows access, suitable inspection stages and required evidence to be considered early. For existing projects, a structured review provides a useful starting point.
Read the article: An inspection concept starts with the right questionWhat information is needed for an initial assessment?
Start with the industry, component group, material, required inspection statement, existing equipment and timeframe. Variants and known difficulties are also useful. We agree a suitable exchange route before receiving confidential drawings or technical documents.
Explore the topic: ContactHow is a suitable inspection method selected?
Material, geometry, target discontinuities, access and the required inspection statement guide the choice. Customer requirements and production conditions also matter. A feasibility assessment using representative components helps establish the suitability and limitations of the proposed method.
Read the article: UT and ET: complementary methods, not blanket alternativesWhat belongs in a sound inspection concept?
It connects the task, component condition, method, inspection regions and evaluation basis. It also covers references, invalid inspections, documentation and responsibilities. Each requirement should be linked to its proposed implementation and traceable evidence.
Read the article: An inspection concept starts with the right questionMethods & components
Which tasks can ultrasonic testing address?
UT may suit examination of internal regions, welded joints and wall thickness. Its capability depends on factors including material, geometry, coupling and discontinuity orientation. Suitability therefore needs assessment for the individual inspection task.
Read the article: Automated ultrasonic testing: the process around the sensorWhen is eddy current testing a useful option?
ET requires electrically conductive materials and may suit defined near-surface tasks and recurring manufacturing inspections. Probe distance and geometry influence the signal. Selection therefore starts with a specific description of the task.
Read the article: UT and ET: complementary methods, not blanket alternativesWhen are VT, PT, MT or RT/CT appropriate?
VT examines visible surfaces and accessible areas. PT reveals surface-breaking discontinuities; MT is suitable for ferromagnetic materials. RT and CT use radiographic imaging or computed tomographic reconstruction to examine internal structures. The right method depends on the material, geometry, target discontinuities and operating constraints.
Explore the topic: NDT KnowledgeHow do inspection tasks differ for castings, forgings and weldments?
Manufacturing condition, material structure, geometry and relevant discontinuities can differ substantially. The inspection stage and evaluation basis also need component-specific definition. One blanket requirement for all three groups is therefore usually an insufficient planning basis.
Read the article: NDT in mechanical engineering: plan inspection earlyWhat matters with complex geometry or restricted access?
Accessibility and component shape influence inspectability and coverage. Identify restricted regions early and show them clearly in the concept. Then assess whether a different inspection direction, a supplementary method or a different production stage is appropriate.
Read the article: Why '100 per cent inspected' does not tell the whole storyAutomation
When is automated NDT worthwhile?
Automation is worth considering when inspection tasks repeat and components, test conditions and material flow can be controlled. The assessment should include setup, product changes, follow-up inspection, maintenance and staffing. This overall view helps identify a technically and economically appropriate level of automation.
Read the article: Which level of automation fits the inspection task?How do manual, semi-automated and fully automated inspection differ?
The difference is which steps people or equipment perform: handling, probe movement, data acquisition, evaluation and sorting. Automated movement does not necessarily mean automated evaluation. The appropriate approach depends on which tasks can be automated reliably and where expert decisions are still needed.
Read the article: Which level of automation fits the inspection task?How can automated inspections be made repeatable?
Positioning, probe movement, inspection programs and relevant process conditions need to remain stable. For ultrasonic testing, suitable acoustic coupling is also essential. Monitoring, traceable settings and agreed system checks help identify deviations; automation alone does not establish that an inspection is valid.
Read the article: Automated ultrasonic testing: the process around the sensorHow are cycle time and material flow considered in planning?
Planning covers the complete sequence: feeding, positioning, inspection, evaluation, documentation and routing of parts. Reference checks, changeovers and interruptions also take time. The measurement time alone is therefore insufficient to assess the throughput an inspection system can achieve.
Read the article: Which level of automation fits the inspection task?How can different component variants be managed reliably?
Each variant needs clearly assigned settings, programs and acceptance criteria suited to its inspection task. Changes to material, geometry or manufacturing should be assessed for their effects. Version control, approvals and a verifiable link between component and inspection program help prevent unnoticed mix-ups.
Read the article: An inspection concept starts with the right questionAcceptance & ramp-up
What is checked during FAT and SAT?
A factory acceptance test typically takes place at the supplier; a site acceptance test checks the installed system at its operating location. The functions, inspection capabilities and interfaces to be demonstrated must be agreed for the project. A successful FAT does not automatically prove performance under actual production conditions.
Read the article: FAT, SAT and ramp-up: plan the evidence earlyWhat evidence should be prepared for system acceptance?
Requirements should be linked to specific test steps, expected results and responsible people. Evidence should cover representative variants, agreed references, data identification, documentation and responses to faults. Open issues need a traceable assessment, an owner and an agreed approach to resolution.
Read the article: FAT, SAT and ramp-up: plan the evidence earlyWhen does retrofitting an existing inspection system make sense?
A retrofit can make sense when the existing system remains a sound foundation but controls, data acquisition, software or individual components need renewal. An assessment should cover mechanics, sensors, documentation and support. It then establishes whether upgrading or replacement better meets future inspection needs.
Read the article: Retrofit: improve existing inspection systems selectivelyCan manual or semi-automated inspection serve as a temporary solution?
This can be useful during ramp-up, modifications or temporary capacity constraints. The alternative must still meet the agreed inspection task, with appropriate personnel, instructions, evaluation and records. A temporary arrangement does not justify silently reducing the required inspection capability.
Read the article: Retrofit: improve existing inspection systems selectivelyWhat should happen after a fault or system stoppage?
First establish the system state, the cause and which components may be affected. Restarting requires defined responsibilities and the checks specified in the inspection instructions. Parts without a clearly valid inspection must remain identifiable and be reviewed or reinspected under the agreed procedure.
Read the article: FAT, SAT and ramp-up: plan the evidence earlyQuality & evaluation
Does 100% inspection mean that every component is defect-free?
No. It can mean that every component is inspected, but says nothing by itself about coverage or the discontinuities that can be detected. Every inspection has defined conditions and limitations. Statements about component quality therefore need to consider the method, coverage, detection capability and acceptance criteria together.
Read the article: Why '100 per cent inspected' does not tell the whole storyHow do inspection scope, coverage and detection capability differ?
Scope describes, for example, which components or batches are inspected. Coverage identifies the regions of a component actually examined. Detection capability describes which discontinuities can be found under the specified conditions. An inspection concept should state these three aspects separately and clearly.
Read the article: Why '100 per cent inspected' does not tell the whole storyDoes every signal indication automatically mean a defect?
No. An indication may arise from geometry, material properties, inspection conditions or a discontinuity. It must be interpreted under the intended procedure and evaluated against the applicable criteria. An indication is therefore not the same as an unacceptable defect.
Read the article: UT and ET: complementary methods, not blanket alternativesIs a calibrated instrument sufficient for a valid inspection?
No. Instrument verification, task-specific setup and checks of the complete inspection system serve different purposes. Suitable reference specimens and documented system checks may be required for the task. Applicable requirements and the inspection instructions determine the necessary evidence and intervals.
Read the article: Understanding reference blocks and system checksHow should invalid or incomplete inspections be handled?
Missing identification, inadequate coupling or an interrupted sequence must not silently produce a pass result. Affected parts need clear identification and review under the agreed procedure. Whether reinspection is required depends on the cause and the applicable inspection instructions.
Read the article: An inspection concept starts with the right questionData & digitalisation
Which data make an inspection result traceable?
Key elements include a unique component or batch identity, inspection time, the inspection program and its version, and the result and validity status. Equipment, personnel, setup and reference data may also be needed. Raw-data requirements should be agreed in advance according to future evidence and analysis needs.
Read the article: Inspection data needs identity and contextHow long should inspection data be retained?
There is no single retention period suitable for every inspection task. Applicable requirements, customer agreements and contractual or legal obligations determine the period. File formats, readability, access rights, backups and responsibilities also need to be defined so the data remain usable throughout that period.
Read the article: Inspection data needs identity and contextWhat matters when connecting inspection to MES, ERP or quality systems?
Component identity, order data, result status and responsibilities need clear definitions first. The meaning of transferred values matters as much as their format. Missing messages, connection failures, duplicate records and restarts should also be addressed during coordination and subsequent functional testing.
Read the article: Inspection data needs identity and contextWhat role can AI play in NDT evaluation?
AI can help review and prioritise large volumes of inspection data. Its value depends on suitable, representative data and robust validation for the specific task. Evaluation limits, changes, human oversight and responsibility for release decisions must remain clearly defined when AI is used.
Read the article: AI in NDT: define the inspection task before the modelPeople & responsibilities
What does personnel certification under ISO 9712 establish?
It concerns an individual's qualification and certification for specified test methods, sectors and levels. The actual scope of the certificate is therefore important. Deployment also needs to consider the assigned tasks, organisational responsibilities and any required familiarisation or authorisation.
Read the article: Distinguishing qualification, familiarisation and responsibilityIs personnel certification the same as company certification or accreditation?
No. Personnel certification applies to the individual and the stated scope of their certificate. Company certifications and accreditations concern different subjects and requirements. Before commissioning work, establish which evidence the service actually requires and which party will provide it.
Read the article: Distinguishing qualification, familiarisation and responsibilityWho is responsible for inspection, evaluation and release?
These roles must be defined before work starts, in line with the task and applicable requirements. Equipment operation, technical evaluation, deviation handling and product release may belong to different people. Responsibility for changing inspection programs, reviewing changes, documenting them and approving them also needs to be clear.
Read the article: Distinguishing qualification, familiarisation and responsibilityDoes equipment familiarisation replace the required NDT qualification?
No. Familiarisation explains how to use a particular system, its programs and operating procedures. It complements the qualification required for the task. NPB can support project-specific familiarisation and process understanding, with the scope agreed according to tasks, existing knowledge and organisational responsibilities.
Explore the topic: ServicesIndustries & collaboration
Which mechanical engineering needs can the consultancy address?
The consultancy is aimed at machinery manufacturers, suppliers and design, production and quality teams. Typical topics include inspection concepts for cast, forged or welded components, product variants and production integration. Support requirements can also be defined for selecting or modernising inspection equipment.
Read the article: NDT in mechanical engineering: plan inspection earlyHow does NPB support projects in the defence industry?
NPB's published industry experience includes defence. Support focuses on clarifying inspection requirements, automated inspection processes, documentation and coordination between parties. The scope is agreed for each project; confidential component data, customer names and sensitive inspection parameters do not belong in public project descriptions.
Explore the topic: Defence industryWhich responsibilities can NPB take on in a project?
The scope can range from technical assessment and inspection planning to support during implementation, acceptance and ramp-up. It can also focus on a clearly defined technical question. Objectives, deliverables, interfaces and responsibilities are agreed before the work is commissioned.
Explore the topic: ServicesCan collaboration take place remotely or on site?
This depends on the task. Document reviews and technical discussions can often be handled remotely, while equipment assessments, trials or ramp-up support may require site visits. Locations, availability and the preferred working language are agreed when defining the project.
Explore the topic: ContactHow does a project get started?
Start with a short description of the inspection task, the current situation and your objective. Open questions, required documents and a suitable scope can then be clarified. This provides the basis for agreeing the approach, deliverables, responsibilities and a quotation. Contact: Sebastian.Kisters@npb-ndt.de.
Explore the topic: ContactHow should confidential project documents be shared?
A general, non-confidential description is sufficient for the initial enquiry. Handling of sensitive documents and appropriate transfer channels should be agreed in advance. The public contact form is not intended for classified or export-controlled content; do not use it to submit such drawings or technical details.
Explore the topic: ContactHow are effort and fees agreed?
Effort depends on the task, scope, duration, location and available documentation. Once these are clarified, an appropriate service model and fee can be proposed, for example for a defined work package or time-based support. Additional services and expenses should be agreed transparently in advance.
Explore the topic: ContactStill have an inspection question?
Tell Sebastian Kisters about your current situation and objective. Together, you can clarify which support would help.
